Home Forums Bolting Kalbarri rebolting progress

  • This topic is empty.
Viewing 1 post (of 1 total)
  • Author
    Posts
  • #5218 Reply
    Rob Wall
    Guest

    Kalbarri rebolting. April 2007.

    Rob Wall and Shane Richardson spent a day putting in some more bolts at the Promenade.

    Coriander 21, now has a two bolt lower off up and left of the last bolt on the route.

    Fuck The Law 25, now has a 2nd lower-off bolt

    Crank-shaft 25 has two new bolts (before and after the old first). Its a lot less scary now!

    All bolts were SS, glued in with hilti RE500.

    Thanks to Kate and Nick for helping us out, to George Firth for getting us the bolts and glue, and to all those who have contributed money.

Viewing 1 post (of 1 total)
Reply To: Kalbarri rebolting progress
Your information:




Scroll to Top